Commercial project in Santa Monica promenade. Electrical contractor for Levi’s store. Complete new installation of light fixtures, emergency exit lights, lighting package, receptacles, electrical panels, electrical breakers. Project time 2 weeks.
Commercial electrical projects, popular Greek fast food “Nick The Greek”. Locations, such as Santa Monica, west Los Angeles, Simi Valley and Oxnard. Complete rewiring according electrical drawings. All paperwork and inspections included. Lighting package installation, kitchen appliance connection, fire protection installation system Ansul, security cameras installations, power and outlets rewiring. Project time around 2-3 months.
Residential new construction. Hi-rise building, 7 floors, a total of 35 units, and the first floor is for commercial purposes. Complete construction from the ground until the last cover for the switch. Main panel installation, all apartments wiring and lighting installation, complete electrical project by drawings. Project time 12-14 months.
Light fixture installation, gazebo project with custom installations.
Complete new electrical service installation including main panel and sub panels, load calculations, drawings, wiring, and inspection. Project time between 2 days and 3 months.
Main Electrical service upgrade. Replacement of old Zinsco panel with only 200A for 12 apartments to modern Siemens with updated requirements, complete rewiring system.